ARCSTRMEPFED
000
Loading federated model Architecture —
BIM Management / Coordination / Documentation
BIM ACE Engineering — Digital Building System

Building Information Modeling, Coordination & Construction Management.

BIM ACE partners with architecture firms, contractors, and developers — locally in Myanmar and overseas — to coordinate BIM models from concept design through full construction documentation.

Currently delivering — Shopping Mall BIM Management Contract
LOD 350 · Federated
Clash set — 0 open
MEP · STR · ARC
4D sequence — wk 01
Fig. 01 — Model volume, not to scale
Scroll
--:--:-- MMT
Construction DocumentationQuantificationCorporate TrainingOverseas OutsourcingBIM CoordinationClash Detection4D SimulationScan to BIM
01 — The practiceEst. Yangon

We don't draw buildings. We coordinate them — resolving the friction between structure, services and architecture before the first pour, so every clash is found on a screen instead of on site.

Who we work with

Architecture studios, main contractors, MEP specialists and developers who want a single source of truth for the building.

How we deliver

Embedded BIM managers, dedicated modelling teams and clear BEP-driven workflows — Revit, Navisworks, Dynamo and ACC.

Where

Myanmar-based, delivering remotely to Singapore, Thailand, Australia and the Middle East.

02 — ServicesSix disciplines, one model
01Modeling
02Coordination
03Simulation
04Quantification
05Documentation
06Management
03 — Selected work

Coordinated.
Built.

A selection of projects where BIM ACE acted as BIM manager, coordinator or modelling partner.

01 / 05
Yangon · 2025—2601

Shopping Mall BIM Management

Retail · 68,000 m²
Mandalay · 202402

Mixed-Use Tower Coordination

Residential · 32 floors
Singapore · 202403

Hospital MEP Federation

Healthcare · Outsourced
Bangkok · 202304

Data Centre 4D Sequencing

Industrial · 5D linked
Yangon · 202305

Office Campus Documentation

Commercial · IFC 4
Scroll or drag →
Fig. 05 — Discipline separation

How We Coordinate

Every discipline is modelled as its own layer, federated into a single model, and resolved in sequence — so nothing reaches site that hasn't already been built once on screen.

1ARC · LOD 300

Architecture

Spatial layout, program and massing — the layer everything else is coordinated against.

2STR · LOD 350

Structure

Structural framing modelled and checked against architecture before it's built.

3MEP · LOD 350

MEP

Mechanical, electrical and plumbing routed and clash-checked against structure and architecture.

4Navisworks · BCF

Clash Resolution

Hard and soft clashes grouped, assigned and closed out in weekly coordination cycles.

54D · 5D

Sequence & Cost

The coordinated model linked to programme and quantities to test buildability before it's tendered.

6IFC · Sheets

Documentation

The coordinated set becomes dimensioned, sheet-numbered construction documentation.

01 / 06
04 — In figuresUpdated 2026
0+

Projects deliveredAcross residential, retail, healthcare & industrial.

0

Years of practiceFounded in Yangon; delivering regionally since 2019.

0

BIM specialistsModellers, coordinators and BIM managers in-house.

0

Countries servedMyanmar, Singapore, Thailand, Australia, UAE, Japan.

16.8409° N96.1735° E
05a — Training

CorporateBIM training.

Structured programmes for firms moving from CAD to BIM — Revit fundamentals through advanced coordination, run on your projects, with your team.

Request a syllabus
MMR SGP · THA · AUS · UAE
05b — Outsourcing

Overseasmodelling teams.

Dedicated, time-zone-aligned BIM teams for international practices — from a single modeller to a full coordination cell, on ACC or your CDE.

Build a team
BIM ACE found forty-two hard clashes in the mall's plant room before steel was ordered. That is the contract paying for itself in week three.
Project DirectorMain contractor — Shopping Mall, Yangon
06 — JournalLatest thinking

Notes from thecoordination room.

Field notes on BIM management, clash resolution and remote modelling — written by the people doing the work, not the marketing team.

4 posts published — new notes as work reaches a stage worth writing about View all articles
Fig. 12 — Next step

Let's build it twice.

Once in the model. Once on site.

hello@bimaceglobal.com

Tell us about the project, the stage and the deliverables — we reply within one working day.

Send a
brief
Fig. 11 — Questions

Frequently askedquestions.

The things architects, contractors and developers usually ask before their first BIM contract with us.

Ask something else

Building Information Modeling is a coordinated 3D model that carries the geometry and the data of every building element. It matters because clashes, quantities and sequencing are resolved on screen — before they become site variations, delays and claims.

Yes — roughly half of our work is delivered remotely to practices in Singapore, Thailand, Australia, the UAE and Japan. Teams work in your time zone, on your CDE, under your BIM Execution Plan.

Autodesk Revit for authoring, Navisworks for federation and clash detection, Dynamo for automation, and Autodesk Construction Cloud or BIM 360 as the common data environment. We also deliver IFC for openBIM workflows and Synchro for 4D.

Every discipline model is federated, run through an agreed clash matrix, and all hard clashes plus agreed soft-clash tolerances are closed out and signed off — with a report you can hand to the contractor.

Send us the drawings, the stage and the deliverables. We reply within one working day with a scope, LOD schedule and fee. Most projects begin with a two-week mobilisation to set up the BEP, templates and CDE.

Yes. Corporate programmes run from Revit fundamentals through advanced coordination and BIM management, delivered on your own live projects so the learning sticks.