Selected work. Verified, not staged.
Every project here has a name, a role and a scope we can put in writing.
We would rather show one project in full than ten as thumbnails. Below is the contract we are delivering now — what the model does on it, which of our services it draws on, and where the work stands. Further case studies are added as they clear client sign-off.
Shopping Mall BIM Management Contract
Retail · BIM Manager roleShopping MallBIM Management Contract
A retail development in Yangon where BIM ACE holds the BIM management role for the project: authoring the discipline models, running the federated clash process, owning the BIM Execution Plan and the common data environment, and issuing construction documentation from the coordinated set.
How these services fit together- Project
- Shopping Mall — retail development
- Location
- Yangon, Myanmar
- Role
- BIM Manager — project-wide
- Status
- Currently delivering
- Period
- 2025 — 2026
- Disciplines
- ARC · STR · MEP
- Client
- Available on request
- Engagement
- Project-based — fixed scope
A mall is a coordination problem wearing a retail brief.
Large open floor plates, long-span structure, dense services above the tenant zones and a fit-out programme that starts before the base build is finished. The client needed one party to own the model across disciplines so that design changes, clash resolution and drawing issue stayed in step — rather than three consultants each maintaining their own version of the building.
BIM ACE was appointed to that role: not as a modelling subcontractor to one discipline, but as the BIM manager for the project as a whole.
Four services, one source.
Each item below is a line from our standard service index, applied to this project. Open any of them on the services page for the full deliverable list.
-
01Revit · LOD 300–400
BIM Modeling
Architectural, structural and MEP models authored against one project template, one origin and one grid system, progressed stage by stage to the LOD each package needs.
Service 01 -
02Navisworks · BCF
Coordination & Clash Detection
Weekly federation and clash runs against the matrix in the BEP; issues grouped, assigned and tracked to close-out through BCF, zone by zone.
Service 02 -
03ISO 19650 · CDE
BIM & Information Management
Ownership of the BIM Execution Plan, CDE structure and permissions, naming and classification standard, and the model-progression tracking the team works to.
Service 03 -
09Sheets · IFC / DWG / PDF
Construction Documentation
Plans, sections, details and schedules issued from the coordinated model with sheet and revision control — so what the site receives matches what was clashed.
Service 09
The drawings are a by-product of the coordination.
Because documentation is issued from the same model that is clashed each week, a resolved clash and a revised drawing are the same event, not two. The contractor gets a coordinated set and a signed-off model per zone; the client gets a single information owner to hold accountable. Results, quantities and lessons will be published here once the project reaches handover and the client approves release.
Setup
BEP, CDE structure, template, shared coordinates, naming standard agreed.
Modeling
Discipline models authored and progressed to the LOD each package needs.
Coordination
Weekly federation, clash runs and close-out, zone by zone.
Documentation
Construction sets issued from the coordinated model with revision control.
Handover
Record model, issue packages and data delivered to the client team.
Projectregister.
One row per project we can name, with the role we held and the services we delivered on it. Rows marked in preparation are work we are documenting for release — they will not be listed until they can be described accurately.
Modelled in Yangon.Delivered whereverthe CDE is.
Our local work is on site in Myanmar. Our outsourcing work lives on the client's common data environment — Singapore, Bangkok, Sydney, Dubai, Tokyo — with a working-day overlap that lets coordination happen in your hours, not ours.
Local time in each market is shown live against Myanmar Time (MMT, UTC+6:30).
- 01Myanmar — YangonMMT · base--:--
- 02Singapore+1:30 vs MMT--:--
- 03Thailand — Bangkok+0:30 vs MMT--:--
- 04Australia — Sydney+3:30 / +4:30 vs MMT--:--
- 05United Arab Emirates — Dubai−2:30 vs MMT--:--
- 06Japan — Tokyo+2:30 vs MMT--:--
Building types our scope and LOD schedules are set up for. Live project in green.
Add your project.
Tell us the building, the stage and where the CDE lives.
We reply within one working day with a scope, an LOD schedule and a fee — and, where relevant, a reference from the project above.